PlanBuilt Control
Project controls applications for EPC teams

Control engineering, procurement and construction before delay becomes irreversible.

PlanBuilt Control turns project data into a common control system: contractual schedule, engineering releases, procurement status, site needs, progress rules and forecast dates connected around the decisions that protect milestones.

EngPro Control
MDRProcurementProgress
18Blocked items
72%Actual progress
9Late deadlines
4Critical paths

Work Pack Readiness

WP01Battery area engineeringReady
WP02Utility tie-insBlocked
WP03Integration packageOngoing
WP04Site commissioningForecast

Forecast Window

Docs
RFQ
Vendor
Site

Objective

Make project information useful while there is still time to act.

Control

Connect plan and production

The contractual plan needs real delivery data. PlanBuilt Control connects releases, procurement, constraints and site readiness so the schedule reflects what can actually happen.

Forecast

Separate signal from noise

Not every delay has the same impact. Dependencies, float, deadlines and baseline variance highlight the items that threaten milestones, cost exposure and management decisions.

Progress

Measure credible progress

Work pack credits, milestone completion and rules of credit turn progress into a traceable view of actual performance, remaining work and forecast completion.

Operating basis

The platform follows a practical project controls method: model, capture, analyse, forecast and decide.

PlanBuilt method

Site data becomes a forecast only when it is structured, traceable and connected to the decisions that management must make before the delay is locked in.

ModelWork packs, baseline, milestones, dependencies and progress rules.
CaptureDocument releases, procurement status, constraints, actuals and evidence.
AnalyseVariance, consumed float, blocked work and activities at risk.
ForecastCredible dates based on logic, remaining work and current project conditions.

Application suite

Focused applications that extend PlanBuilt project controls from engineering to the field and 4D review.

EngPro

Engineering & Procurement Control

Controls MDR documents, procurement packages, deadlines, external dependencies, lookahead, baseline variance and progress by work pack before missing information reaches site.

Construction

Construction Control

Connects daily field activity with constraints, work fronts, short-term planning, supervisor updates, quantities and readiness so site and office work from the same picture.

4D Viewer

4D Schedule Visualization

Links model elements and schedule logic to validate sequence, interfaces, constructability and plan-versus-actual communication with teams and clients.

Built for teams that need the schedule to explain the work.

Use the suite with PlanBuilt Consulting methodology to align planning, data capture, forecast, progress and management decisions in complex industrial and EPC projects.